Project Server 2013 Overview Notes

Project Server 2013 is a Service Application and part of SharePoint Server 2013.  You install the on-prem. version on a SP2013 farm and need to follow the best practices for your SharePoint farm.
  • A Project Web Application (PWA) is a a single site collection.  
  • Consider storing each PWA in it's own content database.
  • Each PWA site collection is made up of multiple projects (each project has it's own SharePoint sub site).
  • Project 2013 online or a project server 2013 on-prem are the hosting options.
  • OData services for reporting, Excel can be used to create and view reports.  This is the approach to use on Project Server Online.  Each PWA instance on-prem. can add OLAP cubes from the PWA manage SSAS screen, once the default cubes are generated, it easy to query using Excel or SSRS (assuming you have the infrastructure). 
  • A single Project Web App database for each Project Server 2013 instance whereas in Project Server 2010, each instance had 4 Project Server databases (Draft, Publish, Reporting, and Archive).
  • Upgrade to Project Server 2016 from Project Server 2013 only.
  • PWA manages security and WSSSync manages the security syncronisation with the SharePoint project sub sites.
  • No user management in PWA, now all done in SharePoint assuming SharePointPermissionMode.  SharePointPermissionMode done in SP not in PWA (What ProjectPermsissionMode), pref SharePoint permissions mode.  oldproj server guys prefer ProjectPermissionMode say it gives more fine grained security control.
  • PWA Security explained https://technet.microsoft.com/en-gb/library/fp161361.aspx
  • To access Project Server 2013 with the Project Server client application (desktop software) you can't use the Standard edition but need the pro edition (Microsoft Project Server professional 2013).
FluentBooks from FluentPro looks good for ALM between environments and PWA instances:
  • Desktop tool - Offline Management - download configuration & then uploads configuration to the new PWA
  • Is there anything to install on the farm? No
  • Ports needed? 80 or 443 Uses web Services (PSI & CSOM when uploading change).
  • Highly configurable such as mapping account between domains as we move environments.


Archiving between 2 PWA instances using FluentBooks
================================

  1. Download/Export projects into a FBB file(s), new project professional client.  Gets the Project data.
  2. Download SharePoint sub sites
  3. Upload FBB file to archive PWA 
  4. Upload sub-sites into the archive PWA


More Info:
https://technet.microsoft.com/en-us/library/ff631142.aspx  Project Server 2013 and SharePoint Security
https://www.fluentpro.com/productsfluentbooks.htmll  FluentBooks website

Alternative:  
Bamboo Solutions appear to have a good Project Management Solution that has gone thru several iterations.  Project Manager Central sits on SharePoint 2007, SP2010 or SP2013.  Similar concept to Project Server, Portfolio site is a site collections and then project sites are sub-sites.  There is also an option to have Department sites whereby a sub site is created that subscribes to multiple project sites.

Sunday 13 March 2016

How Browser Cookies work in SharePoint

Overview:  SharePoint by default uses disk-based persistence using a FedAuth Cookie.  In most enterprise clients there are multiple different application and authentication providers.  Cookies can be set for session persistence in multiple ways and as the application world is walking toward SSO is becoming even more prevalent for unexpected behavior to happen with cookies.

Thoughts:
  • Cookies that keep are responsible for authentication can be stored for the browser sessions either on Disk or in session.
  • By default, SharePoint uses disk-based authentication for the user's session using the FedAuth cookie.  Switching to session based persistence should not be undertaken without considerable forethought.
  • Watch out for IE's odd behaviour relating to session whereby domain level permissions are passed down to sub-domains.
Chrome Developer Tools makes it easy to monitor cookies on sites: F12 > Application > Cookies > Chose the site to see the cookies


More Info:
http://erik.io/blog/2014/03/04/definitive-guide-to-cookie-domains 
http://blogs.msdn.com/b/ieinternals/archive/2009/08/20/wininet-ie-cookie-internals-faq.aspx
https://blogs.msdn.microsoft.com/ie/2009/05/06/session-cookies-sessionstorage-and-ie8-or-how-can-i-log-into-two-webmail-accounts-at-the-same-time/

Sunday 28 February 2016

What makes Successful SharePoint projects

Overview:  There tend to be characteristics of successful SharePoint projects and if the majority of these are in place for SharePoint or any IT  project for that matter, the project tends to be successful.

High Level:

  1. The project has a clear vision that engages and inspires everyone.  Do we know what we are building and why.  Do some or most team members have a strong feeling of ownership. Strong decision makers or a product owner is SCRUM parlance is essential.  This crazy idea of all inclusive decisions and management by committee (“I was elected to lead not read”, Simpson movie) wastes time, leads to an incomplete vision and often worse decisions are made.  The business must pick a leader or 2 and let them get on with it.  Rather get a product owner that makes decisions and is periodically wrong, these changes can be fixed easily when it becomes clear they are wrong.  Only decisions that are not easy to change should go to review and generally there are not many of these.
  2. People - The team members select is the most important factor in successful projects.  Encourage an open respectful collaborative team with mixed talents and strong skills at the right time.   Note: Leave you ego at the door.  There will and should be arguments.  Don't let the arguments become personal in nature and find people that will get over minor squabble.
  3. Delivery Focused.  Each team member needs to know his/her deliverables are.  Methodologies like SCRUM are useful to make this happen.  Build a product backlog and prioritize, but fundamentally it’s building the right piece at the right time.  High standards must be set (review broken window principle), each member of the team must be professional and deliver quality.
Team Structures:
My preference on complex projects is a small teams of hard working problem solving individuals that take pride in their work and have a history of delivering successful projects.   In short, there are a lot of people that talk the talk but don't walk the walk (aka they are lousy) in IT projects.  Someone who is referred to you by someone I trust as a general rule works out brilliantly, people I have worked with in successful projects are the 1st people i look for.  You can't always get who you want but you sure can try aim for the stars and get a great team together.  The difference between the best and worst developer on my teams tends to be a factor of 8 so I recon the most productive person delivers 8 times the value of the least productive.  Try skip the bottom folks, the top folks don't get paid 8 times as much....

The formula to High performing teams is a varied group of committed zealous people, collective in a shared idea.  I’m looking for people that want to be successful, others in our team to be successful and people like.  Team members must have strong skills, the ability to listen and stand-up for what they believe and play well in a group.  I try exceed my clients expectations continuously and if I can get a critical mass on my team that do the same….  Actually the word "formula " is misleading as is too strong a word, it's simple: get smart, hard working, experience people that are nice.

Fundamentally, the goal is to build a cohesive team, it's also worth reading Patrick Lencioni's book "The Advantage" and in "The Five Dysfunctions of a Team", the 5 factors to a successful teams are listed as:

  1. Trust one another and be prepared to show your vulnerability/lack of expertise/be prepared to apologies if you get something wrong.
  2. Conflict is good and productive, argument is needed to get the best solution
  3. Commit to getting the project right/take ownership and agree to decisions collectively
  4. Accept accountability/take ownership/each team member should try exceed client expectations continuously
  5. Focus on results - as a team what we deliver needs to work and be a success.
All pretty obvious but the number of teams and projects that fail and don't follow these basic guiding principles is staggering.

Sunday 14 February 2016

Notes on Compliance in Office365 & SharePoint

Also see: Data Protection Using SharePoint

Data Loss Prevention (DLP)
Historically used for email to identify, monitor and protect data.  This is the next step on from email policies/IT Policies where sent around and signed with the hope users would behave and only send appropriate information along.   DLP ensure that sensitive information such as patents, financial information, Payment Card Industry Data Security Standard (PCI DSS) , personally identifiable information (PII), or intellectual property (IP) are accidentally shared with external parties.  DLP can inform users before they send email or open access to OneDrive or SharePoint document libraries that the information being shared violates company policy (as configured in the DLP template).
https://blogs.office.com/2013/10/28/office-365-compliance-controls-data-loss-prevention/
https://blogs.office.com/2014/08/27/search-sensitive-content-sharepoint-onedrive-documents/

Information Rights Management (IRM)
IRM-Protect document libraries prevents sensitive information being copied, forwarded, printed

eDiscovery
Find related content with SharePoint, Exchange & files shares to assit with litigation and determining info on a topic ata point in time.

Records Management
Manage a documents life-cycle, stop key docs being amended or edited.

Information management policies
Enforce compliance such as expired content, usage auditing & retention policies

Office 365
All data is encrypted on the servers (encryption at rest) and TLS/SSL on all communications.

Other
DocAve can enhance IRM and archieving & they have a SharePoint Monitoring and Policy Enforcement module.

Reference:
https://support.office.com/en-us/article/Use-Office-365-to-help-comply-with-legal-regulatory-and-organizational-compliance-requirements-ce773cec-2151-4d06-9a4e-2818613bd7e0

Wednesday 13 January 2016

Debug SharePoint ClientContext using IE Developer tools

Overview:  I have a redirect that looks at my client context and performs a redirect.  Fiddler is a good option for viewing JS and debugging but as IE developer tools is not my normal tool for JS debugging, I thought I'd try use it to debug my issue.  I need to debugging a JavaScript redirect (302) using IE Developer Tools and breakpoints.

Steps:
1. Fn + F12 to get the IE Developer Tools
2. Enter the redirection url https://demo.dev/sites/demo/SitePages/Redirection.aspx in IE
3. As the page is running hit the "Esc" key to stop the browser (I need it to get the js files in the redirection page).

4. The Folder Icon mark as point 1 in red on the diagram is used to find the js file to debug.
5. Open the js file step 2 and step 3 in the red annotation above.
6. Set break point as shown below
7. A watch windows is provided. Variables are easy to follow.
8. When you refresh if the breakpoints are set, you will get stopped at the break points you previously setup in the steps above for subsequent runs.


Sunday 3 January 2016

Azure Virtual Machine Basics

Azure Virtual Machine Basics
Windows Azure Virtual Machines
  • Azure charges per minute pro-rated
  • Disks explained:
    • C: OS disk
    • D: Temp Cache such as Page File (won't be persisted in a disaster)
    • F: ... Persist disk storage (Add disks as shown below)
  • Access the VM by default RDP sessions and remote PS are allowed.  








  • Need to add endpoints to allow other means of access e.g. 443 for https traffic.







  • Availability Sets are used to to load balance with more than 1 VM
  • Add a new F drive to the VM




Sunday 6 December 2015

Smoke Testing SharePoint using Selenium IDE

Overview:  In SharePoint we need to retest code often as we make incremental changes.  Basic smoke testing is useful in that is allows you a certain degree of confidence that a bug has not crept into your latest deployment.

Most projects have varying degrees of control to ensure bugs do not cause unexpected behaviour and on the more advanced practices is unit testing and coded UI tests.  The unit tests are tricky with all the new SharePoint development methods.  Jasmine is a JavaScript testing framework and check out the @SPDoctor (Bill) for basic testing information.  Unit testing SP is difficult as the revs end up test SP and not the changes.  A lot of the code is UI driven which is hard to unit test.  I have previously written about code UI testing, MTM as part of the MS test and continuous testing.  And part of this is Selenium WebDriver.  I've used it once on a large project and it was awesome.  Now as you go into production you normally will do some manual smoke testing to check the deployment.

This post looks at automating smoke test.

There are various tools for recording smoke test or you can do the manual eyeball approach favoured my most SP project still.  I have used Powershell (both to gen http requests and to control IE).  MTM is good but it requires buy into the whole MTM process.  Personally I like Selenium IDE for Firefox.  It offers recording, and the capturing functionality is miles ahead of anything else.  These Selenium generate test can be export and used with Visual Studio or build into TFS or on a project I used TeamCity to run automated continuous build and integration.

Note:  Selenium IDE is the recording piece and Selenium WebDriver is the heavy duty real testing integration part.

Get Started:
1. Download Selenium IDE (make sure you get the Selenium IDE, I'm using version 2.9.0) 
2. Understand the UI and capabilities (YouTube basic Selenium IDE videos are great)
3. Install Selenium IDE on Firefox as shown below:




























4. Launch Selenium IDE using FireFox








5. Record and run Selenium test (2 minute short video providing a Selenium IDE recorded test against a SharePoint Online Team Site).

Another option is to control IE using PowerShell
PS> $ie=New-Object -com internetexplorer.application  #open ie
PS> $ie.Navigate("http://www.radimaging.co.uk/Pages/default.aspx")